Advertisement
HANNOVER MESSE 2018, 23 - 27 April
Homepage>Exhibitors & Products >Dual, mech. Working main emergency brake
PremiereR&D-Project

Dual, mech. Working main emergency brake

Safe emergency shutdown for wind power plants and more!

AXBES Energy Veit Müller

Exhibitor details

Exhibition stand
Topic: Group Exhibit Hydrogen + Fuel Cells + Batteries

Contact(s)
Ms. Ina Müller
Send E-mail
Mr. Veit Müller
Send E-mail
Show all Show less

Product description

R & D: Partner or investor for the integration and implementation in WEAs or other attractive applications sought!
The axial movement accumulator is a safety system at a very high level and as a replacement for toxic accumulators, capacitors and hydr. Systems.
In wind turbine power plants, mainly 2 systems are currently installed:

1. a complex hydraulic and thus wet, which with all the disadvantages of a hydraulic plant in the long-term employment works under climatically difficult conditions.
2. the electrical mostly powered by batteries, which only covers the mains failure and not the defect on the adjustable motor or its control.

Technological advantage is the reliable replacement of the adjustment drive incl. Control, next to and in case of mains failure.
The basis for this is the patent of this long-term energy storage device. The extremely powerful rotary movements are compact, stored and dosed in large quantities. So, at the same time, a defined work delivers and adapts to pre-set torques.
Positive feasibility studies were carried out taking into account the required applications and various calculations for use as a rotor blade replacement.
Two users for test and demonstration systems are acquired.
At the moment, we are at the stage of adding value to this electro-mechanical assembly. The robust compact memory can be used sustainably under extreme climatic conditions and is looking for marketing-competent partners.
R & D: Storage utilization as a power converter for photovoltaic plants is easy to implement due to its special features.

Storage delivery in cooperation with Scherdel Group in consultation within 12 weeks possible.

A small series including drawing sets has already been created. This is a precise construction which allows for problem-free seed production.

Development status
Soon market ready

Market introduction
03.2018

Degree of documentation
Very well documented

Market orientation
Medium-size market

All products offered by this exhibitor

PremiereR&D-Project

Dual, mech. Working main emergency brake

Safe emergency shutdown for wind power plants and more!read more

Stored items

0

Server communication error: Item could not be saved.