advertisement
advertisement
HANNOVER MESSE 2018, 23 - 27 April

easywire

Save Time, Save Money

Logo Rayleigh Instruments

Exhibitor

Rayleigh Instruments

Exhibitor details
Exhibitor details

Product description

A unique concept that dramatically reduces the wiring/installation time of multifunction power meters and current transformers.

Labour savings of around 90% are achieved when compared to traditional wiring methods.

These savings are made possible due to the innovative design of both the current transformers and the meters, which allow plug in connectors to be used for both current and voltage input/output. An RJ45 lead is used for connecting between the three phase current transformer and meter, and 'readymade' plug in leads are used for the voltage input.

The meters are provided with both input and output voltage connections which allow up to 32 meters to be daisy chained to a common supply voltage via the first meter.

FEATURES

Substantial labour savings.
Elimination of wiring errors.
Increased safety. Internal circuitry limits high voltages if current transformer is disconnected under load.
No need for current transformer shorting terminals.
Proven design - successfully in service.
Simple plug-in connection for both current and voltage inputs/outputs.
Reduced testing time.
Choice of 5 three phase current transformer frame sizes.
Choice of 2 meter designs.
Less qualified installers required.
Fully EMC tested and CE certified.
Supplied with or without cables to suit your requirements.

Product website

Hall 12, Stand E41

Stored items

0

Server communication error: Item could not be saved.