advertisement
advertisement
HANNOVER MESSE 2018, 23 - 27 April
Homepage>Exhibitors & Products >Factory planning

Factory planning

Logo IPH-Institut für Integrierte Produktion

Exhibitor

IPH-Institut für Integrierte Produktion

Exhibitor details
Exhibitor details
Logo Factory planning

Product description

Since our founding in 1988, we have been successfully planning factories. We offer interdisciplinary planning services in cooperation with architectural firms. The latest research findings, such as energy efficiency, have a great influence on our work.

We offer the following service modules from which you can compile packages of services according to your needs.

Specification of requirements & definition of goals: Together with you, we develop goals and structural fields for your factory (e.g. versatility) and turn these into concrete requirements (e.g. modular layout).

Factory analysis & basic evaluation: As part of the factory analysis, planning-relevant information is collected about the actual state (e.g. equipment, material flows, restrictions) as well as forecast data (e.g. concerning the production program).

Structural design & area layout planning: In this phase, we define and dimension suitable structural units and their relationships and develop the ideal and actual layout variants for your factory together with you and other planners.

Layout assessment & layout selection: In this phase, the developed layout alternatives are evaluated together with you, based on the requirements from the definition of goals, and a preferred alternative is selected.

Detailed layout planning: The detailed layout planning involves the integration of incorporated equipment including all necessary functional areas in the preferred variant, i.e. their arrangement on the work system level.

Cost estimation: In a interdisciplinary team, for example, together with architects and building engineers, we determine the estimated investment needs for the proposed (re-)construction projects.

Hall 2, Stand A08

Innovative Lower Saxony

Stored items

0

Server communication error: Item could not be saved.